Assam: Landslide at Subansiri dam leads to shutting down of diversion tunnel
01:24 PM Oct 27, 2023 IST
|
NE NOW NEWS
UpdateAt: 01:24 PM Oct 27, 2023 IST
Advertisement
LAKHIMPUR: A major landslide has been reported from the Lower Subansiri hydroelectric power project site of the NHPC along the Assam-Arunachal Pradesh border.
This fresh tunnel has reportedly led to shutting down of a diversion tunnel of the hydro project.
According to reports, the landslide led to closure of the No 1 diversion tunnel on the left bank of the hydro electric power project.
Reports claimed that a total of eight diversion tunnels have been closed so far.
(More details awaited)