For the best experience, open
https://m.nenow.in
on your mobile browser.

Arunachal: OIL achieves successful capping of Well 76 at Kharsang Oil Field

09:59 AM Nov 23, 2025 IST | Avik Chakraborty
Updated At - 10:02 AM Nov 23, 2025 IST
arunachal  oil achieves successful capping of well 76 at kharsang oil field
After the BOP was removed, the pre-positioned capping stack was installed on the wellhead, successfully redirecting and containing the gas flow.
Advertisement

Dibrugarh : Oil India Limited (OIL) has successfully completed the capping operation at Well KSG#76 in the Kharsang Oil Field, operated by GeoEnpro Petroleum Ltd (GEPL) in Arunachal Pradesh's Changlang district.

The blowout occurred on 30 October 2025 during service operations, causing an uncontrolled gas release.

Advertisement

OIL’s Crisis Management Team (CMT), with support from Cudd Well Control, USA, and GEPL, took charge on 1 November and began safely removing the damaged Blowout Preventer (BOP) from the wellhead.

After the BOP was removed, the pre-positioned capping stack was installed on the wellhead, successfully redirecting and containing the gas flow.

Once secured, the BOP was closed, stopping the gas discharge from Well KSG#76.

OIL credited the operation’s success to careful planning, technical expertise, and strong collaboration between global specialists and local teams.

The company thanked the Arunachal Pradesh administration, the Ministry of Petroleum & Natural Gas, and the local community for their support.

OIL affirmed its commitment to safe, sustainable, and efficient operations while proceeding with the next phases of the well control roadmap.

Advertisement
Advertisement